Systems
Case Studies: University of Liverpool
The heating infrastructure project contains a combined heat and power unit comprising a gas engine and associated combination boiler,plus two conventional boilers in an energy efficient installation. The development provides electricity, primary high-temperature heat and effective re-use of high and low grade waste heat. It is situated in a new building next to the listed 19th century Royal Liverpool Infirmary, and its associated boiler house, both originallydesigned by Sir Alfred Waterhouse.
The striking external elevations comprise of aluminium and glass - Seniors SCW Curtain was specified for the main elevation.

